PROJECT LIST

GalleryOn going
  • 1. Projek Menaiktaraf Loji Rawatan Air Jenun Baru Dari 55 MLD Kepada 110 MLD Di Daerah Pendang, Kedah Darul Aman
  • 2. Replacement of Deteriorated Valves and Other Associated Works at Intake and Balancing Reservoir, Sg. Semenyih Water Treatment Plant
  • 3. CAPEX 2024: Phase 5 (Zone 2_PJ,KLG,KLT) - Proposed Automation of Key Valves at Selected Distribution Network Locations
  • 4. Proposed Distribution Improvement Works For Hulu Selangor - Activation Of 12 MG Batu Arang Reservoir And Its Distribution System
  • 5. CAPEX 2025: Phase 7 (Zone 2) - Online Network Modelling At Semenyih And Langat Trunkmain
  • 6. Cadangan Untuk Membina (Reka & Bina) 'Sludge Dewatering Facility' Di Loji Rawatan Air Sungai Pinang Untuk Perbadanan Bekalan Air Pulau Pinang Sdn Bhd
  • 7. The Proposed Construction And Completion Of 25 MLD Water Treatment Plant, Vertical Wells And Related Works For Kelar Water Treatment Plant (Phase 2), Jajahan Pasir Mas, Kelantan Darul Naim For The East Coast Economic Region Development Council (ECERDC)
  • 8. CAPEX 2025: Phase 6 (Zone 3) - Proposed Automation Of Key Valves At Selected Distribution Network Locations
  • 9. Membekal, Memasang, Menguji Dan Mentauliah Bagi Loji Penyahgaraman 0.24 MLD Di Pulau Aman, Pulau Pinang (Tender Semula)
  • 10. Cadangan Membekal, Memasang Dan Mentauliah Satu (1) Unit Pam Set Berkapasiti 90 MLD Dan Kerja-kerja Berkaitan Di Stesen Pam Bukit Dumbar 2 (BD2), Lot 297-301, Jalan Bukit Dumbar, 10000 Georgetown, Pulau Pinang Untuk Perbadanan Bekalan Air Pulau Pinang Sdn Bhd
  • 11. Cadangan Untuk Menggantikan Dua (2) Unit 23 MLD Pam Angkat Tinggi, Satu (1) Unit 23 MLD Pam Angkat Rendah Dan Kerja-kerja Berkaitan Di Loji Rawatan Air Bukit Toh Allang, S.P.U, Pulau Pinang
  • 12. Pemulihan Sistem Sedia Ada "Dissolved Air Flotation" (DAF) Kepada Proses Rawatan Air Yang Lebih Cekap Dan Berkesan Di Loji Rawatan Air Sungai Dua
Completed
  • 1. Design, supply, install, testing and commissioning of SS304 Lamella Plate at Kampung Jong WTP
  • 2. Design, supply, install, testing and commissioning of filter cast in-situ at Kampung Jong WTP
  • 3. Design, supply, install, testing and commissioning lateral type filters at Teluk Kepayang WTP
  • 4. Design, Supply and Install Pulsator Lamella Plate System and Filter Underdrain System at Sultan Iskandar WTP
  • 5. Sungai Kinta Dam Water Supply Scheme Design, Supply and Install of Tube Settler System for Tank 3 and Tank 4 of Pre-treatment System for Sungai Kinta Water Treatment Plant
  • 6. Design, Supply and Install Pneumatic System for Filters at Labohan Dagang Water Treatment Plan
  • 7. Refurbishment Works to Water Treatment Residue Disposal Plant and Associated Works at Batu Ferringhi Water Treatment Plant
  • 8. Supply, Deliver and Commission of (A) 3 Units of 136 MLD (30MGD) Spare Low Lift Pump Set (B) 1 Unit of 120 MLD (26.5MGD) Spare Low Lift Pump Set For Sungai Dua WTP
  • 9. Improvement Works for STF Process and Upgrading Chlorination System and Other Associated Works at Sg. Labu WTP
  • 10. Supply, Deliver, Install, Test and Commission 5 Units Treated Water Horizontal Split Casing Pumps (Replacement) and Associated Works at Batu Ferringhi Water Treatment Plant
  • 11. Extension of Existing Sludge Treatment Plant, Improvement Works at Flocculation Tanks, Lovo Tanks and Other Associated Works at Rantau Panjang Water Treatment Plant
  • 12. Cadangan Langkah Mitigasi Jangka Pendek bagi Sistem Bekalan Air Negeri Perlis - Design and Build 40MLD Water Treatment Plant
  • 13. Package 3A Automation Of Ten (10) Nos. Of Key Valves At Selected Distribution Network Locations For Pengurusan Air Selangor Sdn Bhd
  • 14. Package 3C Automation Of Fourteen (14) Nos. Of Key Valves At Selected Distribution Network Locations For Pengurusan Air Selangor Sdn Bhd
  • 15. Bina/Pasang Loji/Kolam Takungan dan Paip Utama Daerah Manjung, Perak Darul Ridzuan - Projek Menaiktaraf Loji Rawatan Air Beruas (Filtration Plant)
  • 16. Muda River Water Scheme Phase 4A, Package 12A - 114MLD Process Units and Associated Works, Sungai Dua WTP, Seberang Perai Utara
  • 17. Upgrading of Main Compressed Air Piping with Hybrid Pneumatic Control System, Replacement of Tubing and Other Associated Works for Package 10 & Package 11 for Sungai Dua WTP
  • 18. Rehabilitate the Existing Phase I Filter Bed to Dual Parallel Lateral Underdrain Rapid Gravity Sand Filtration System and Other Associated Works at Sungai Dua WTP
  • 19. CAPEX 2023: Phase 4 (Zone PJ1) - Proposed Automation of Key Valves at Selected Distribution Network Locations