1. Design, supply, install, testing and commissioning of SS304 Lamella Plate at Kampung Jong WTP
2. Design, supply, install, testing and commissioning of filter cast in-situ at Kampung Jong WTP
3. Design, supply, install, testing and commissioning lateral type filters at Teluk Kepayang WTP
4. Design, Supply and Install Pulsator Lamella Plate System and Filter Underdrain System at Sultan Iskandar WTP
5. Sungai Kinta Dam Water Supply Scheme Design, Supply and Install of Tube Settler System for Tank 3 and Tank 4 of Pre-treatment System for Sungai Kinta Water Treatment Plant
6. Design, Supply and Install Pneumatic System for Filters at Labohan Dagang Water Treatment Plan
7. Refurbishment Works to Water Treatment Residue Disposal Plant and Associated Works at Batu Ferringhi Water Treatment Plant
8. Supply, Deliver and Commission of (A) 3 Units of 136 MLD (30MGD) Spare Low Lift Pump Set (B) 1 Unit of 120 MLD (26.5MGD) Spare Low Lift Pump Set For Sungai Dua WTP
9. Improvement Works for STF Process and Upgrading Chlorination System and Other Associated Works at Sg. Labu WTP
10. Supply, Deliver, Install, Test and Commission 5 Units Treated Water Horizontal Split Casing Pumps (Replacement) and Associated Works at Batu Ferringhi Water Treatment Plant
11. Extension of Existing Sludge Treatment Plant, Improvement Works at Flocculation Tanks, Lovo Tanks and Other Associated Works at Rantau Panjang Water Treatment Plant
12. Cadangan Langkah Mitigasi Jangka Pendek bagi Sistem Bekalan Air Negeri Perlis - Design and Build 40MLD Water Treatment Plant
13. Package 3A Automation Of Ten (10) Nos. Of Key Valves At Selected Distribution Network Locations For Pengurusan Air Selangor Sdn Bhd
14. Package 3C Automation Of Fourteen (14) Nos. Of Key Valves At Selected Distribution Network Locations For Pengurusan Air Selangor Sdn Bhd
15. Bina/Pasang Loji/Kolam Takungan dan Paip Utama Daerah Manjung, Perak Darul Ridzuan - Projek Menaiktaraf Loji Rawatan Air Beruas (Filtration Plant)
16. Muda River Water Scheme Phase 4A, Package 12A - 114MLD Process Units and Associated Works, Sungai Dua WTP, Seberang Perai Utara
17. Upgrading of Main Compressed Air Piping with Hybrid Pneumatic Control System, Replacement of Tubing and Other Associated Works for Package 10 & Package 11 for Sungai Dua WTP
18. Rehabilitate the Existing Phase I Filter Bed to Dual Parallel Lateral Underdrain Rapid Gravity Sand Filtration System and Other Associated Works at Sungai Dua WTP
19. CAPEX 2023: Phase 4 (Zone PJ1) - Proposed Automation of Key Valves at Selected Distribution Network Locations